Fictional worked example

Bracket a leak found between weekly readings

A household checks its meter every seven days. A continuous 0.1 L/min loss is found at the next check. Compare two possible start dates: halfway through that week or just after the previous normal reading.

Open Calculator

Inputs and calculation

Midweek start
Tool inputValue
CurrencyUSD
Volume or billing unitm³
Flow (L/min)0.1
Days or equivalent sessions3.5
Price per billing unit (USD)3.5

0.1 L/min × 1,440 min/day × 3.5 days = 504 L. Divide by 1,000 for m³, then multiply by 3.5 for USD 1.76.

Tool result · USD 1.76

Seven-day maximum under the sample assumptions
Tool inputValue
CurrencyUSD
Volume or billing unitm³
Flow (L/min)0.1
Days or equivalent sessions7
Price per billing unit (USD)3.5

0.1 L/min × 1,440 min/day × 7 days = 1008 L. Divide by 1,000 for m³, then multiply by 3.5 for USD 3.53.

Tool result · USD 3.53

What the comparison shows

The full-week estimate is roughly twice the midweek estimate. The calculator prices duration scenarios and does not date the start.

Assumptions and limits

The earliest start is an assumption tied to the inspection schedule. Variable flow requires a separate average.